VegaVinç

Portal Vinçler

Semi-Gantry Crane

A crane running on a floor rail on one side and a bracket rail fixed to a wall or column on the other. It works with a single row of legs, takes little floor and limits the load on the building.

Model code:
OF-PRT-YRI

Priced per project

Support

Floor + bracket

Capacity

Calculated per project

Span

To facility dimensions

Support arrangement

One side floor rail, other side wall or column bracket

REQUEST A QUOTE

Technical Specifications

SupportFloor + bracket
CapacityCalculated per project
SpanTo facility dimensions
Support arrangementOne side floor rail, other side wall or column bracket
PrerequisiteBearing capacity of the supporting structure is verified
Synchronous travelDrive and braking values calculated for both sides together

Highlights

Half the foundation work

A single row of legs cuts lost floor and foundation cost against a full gantry.

Limited building load

Part of the load goes to the ground, so the share on the building is lower than with a full overhead crane.

Bracket fixing is calculated

The bracket transfers moment as well as vertical load; the fixing point is calculated at survey and reinforced if needed.

A semi-gantry crane sits between a full gantry and an overhead crane. On one side a leg travels on a floor rail; on the other, a bracket rail is fixed to a wall or an existing column. The load is transferred partly to the ground and partly to the building.

When it comes into play

There are two typical situations. First: the building has a load-bearing column along one side, but the roof truss cannot carry the load of a full overhead crane. Second: the area the crane must serve covers only part of the building, and a full gantry would take up floor space and divide traffic unnecessarily.

In both cases the semi-gantry lets one end use the existing structure, halving both foundation work and lost yard space.

The governing condition: the structure carrying the bracket

Here the decisive item of the project is not the crane but the wall or column that will carry the bracket rail. Besides the vertical load, the bracket transfers into the structure the moment arising from the girder span. The bearing capacity of the fixing point is therefore calculated during the survey, and reinforcement is specified where needed.

If this check is skipped in an existing building, the result can be cracking or permanent deformation in the column. Column section, reinforcement details and existing loads are assessed together when measurements are taken.

Structure and travel

The leg on the floor side runs on a travel unit sized to wheel pressure and rail profile; the bracket side travels on a rail running along the wall. Synchronous movement of the two sides matters: a speed difference makes the crane skew and wears rail and wheels. Drive arrangement and braking values are therefore calculated for both sides together.

Sizing

Span, hook height and capacity are determined against what both the floor rail and the bracket side can carry. Whichever side is limiting shapes the project.

REQUEST A QUOTE

Request a quote for this product

Product

Semi-Gantry Crane

Semi-Gantry Crane Manufacturing | Vega Vinç